| 19 March 1882 | The cornerstone is laid. The first architect, Francisco de Paula del Villar, plans a fairly conventional neo-Gothic church; Gaudí isn't in charge yet. |
| 1883 | Antoni Gaudí takes over and gradually turns Villar's church into something far more ambitious: 18 towers, three monumental façades, five naves, transepts, an apse, cloisters, sacristies, chapels and the huge central Tower of Jesus Christ. |
| 1885 | The Chapel of Saint Joseph in the crypt opens, and worship begins while building continues. |
| 1891 | Work begins on the Nativity façade, the part most directly tied to Gaudí's lifetime. |
| 1914 | Gaudí stops taking other commissions and spends his last 12 years only on Sagrada Família, knowing he will never see it finished. |
| 1925 | The bell tower of Saint Barnabas on the Nativity façade is completed, the only tower Gaudí sees finished. |
| 10 June 1926 | Gaudí dies, days after being struck by a tram. His collaborators carry on. |
| 1936 | In the Spanish Civil War his workshop is attacked: drawings are burned, photographs destroyed and plaster models smashed. Because Gaudí relied heavily on three-dimensional models more than on detailed drawings, the loss is one of the biggest problems later architects face. |
| 1939 onwards | Architects and craftspeople rebuild the surviving model fragments and interpret Gaudí's intentions, which is what lets construction continue. |
| 1954 | Work begins on the stark, monumental Passion façade. |
| 1976 | The four Apostle towers of the Passion façade are completed, and the silhouette starts to look like the one visitors recognise. |
| Late 1970s to 2010 | The main body of the church takes shape: foundations, columns, façades, nave vaults, cloisters and the Passion façade sculpture. |
| 1986 | Major work begins on the nave. The nave, transept, crossing and apse go up from the late 1980s onwards, with computer modelling increasingly important. |
| 2005 | The Nativity façade and crypt become part of UNESCO's Works of Antoni Gaudí World Heritage Site. UNESCO does not list the whole modern basilica. |
| 7 November 2010 | Pope Benedict XVI consecrates the church and declares it a minor basilica. The interior becomes a working place of worship, and the modern visitor experience really begins. |
| 2016 | The western sacristy and the cloister of Our Lady of Dolours are completed, and construction begins on the six central towers. Work on the Passion façade pediment continues through the 2010s. |
| March 2020 | COVID-19 halts construction, and with Barcelona tourism shut down the visitor income that funds the work collapses. Work resumes later in 2020, but the old 2026 goal becomes much harder. |
| 29 November 2021 | The star crowning the Tower of the Virgin Mary is installed; the tower rises 138 metres, and on 8 December the star is lit for the first time. |
| 2022 | The towers of the Evangelists Mark and Luke are completed, each topped by its traditional biblical symbol. |
| 12 November 2023 | The four Evangelist towers, about 135 metres tall, are inaugurated together. Five of the six central towers are now complete; only Jesus remains. |
| 2024 to 2025 | The Tower of Jesus Christ rises quickly. A huge crane installed in May 2024 has the top of its jib about 203 metres above the ground, high enough to place pieces above the tower. |
| Late 2025 to early 2026 | The cross is assembled piece by piece from prefabricated parts, partly concrete and stainless steel; the four horizontal arms go up before the final upper section. |
| 20 February 2026 | The upper arm of the cross is lifted into place. The basilica reaches 172.5 metres for the first time, and the outside of the Tower of Jesus Christ is complete. |
| 10 June 2026 | On the centenary of Gaudí's death, Pope Leo XIV blesses the tower, which is then lit for the first time. |
| July 2026 | The main crane is lowered to 174 metres, not removed, and reassigned mainly to the Glory façade towers. |
| September 2026 | The Basilica's construction update names the main projects: the inside of the Tower of Jesus Christ and its lift, the Glory façade, the Chapel of the Assumption, and restoration of the Nativity façade. |